How long does it take for a turbine to ‘pay back’ the energy used to manufacture it?


It has been shown it will take 3-5 months of operation before the average wind farm pays back the energy used in its manufacture. This compares favourably with coal or nuclear power stations, which take about six months. Wind energy is a form of development which is essentially reversible – in contrast to fossil fuel or nuclear power stations.

<< Back to FAQs